• Login

Case Studies: Articles examing Business Information System failures

Case studies of publicly known Business Information System failures with a view to drawing out the lessons to be learned by applying the methods and principles advocated by Dr James Robertson to such projects

Case studies with regard to successful projects that I have been involved in are contained in the Articles database and also under the Precision Configuration menu option

 

<<< PREVIOUS SECTION:  IT Effectiveness

 

 

<<< PREVIOUS SUB-SECTION:  Critical Factors for I.T. Success

 

 

NEXT SECTION:  Speaking and Training >>>

NEXT SUB-SECTION:  The BBC Digital Media Initiative Debacle >>>

 

Critical Lessons from the BBC DMI Debacle

A brief analysis of the failed BBC DMI project advocating that such projects are fundamentally of an engineering nature and should be managed accordingly and that there is great need for Government to introduce statutory controls on the conduct of the Business Information Systems industry

What is noticeable about the BBC’s failed Digital Media Initiative (DMI) is the comprehensive reporting of management failure to manage effectively and management’s apology to the public.

What is noticeably absent is any comment on the performance of the suppliers, Siemens who presumably were supplying the physical technology or the performance of any of the supposedly professional service providers, who consumed the £125.9 m (before recoupment).

The breakdown of expenditure is instructive:

  • Contractors - £46.7m
  • IT - £37.2m
  • Siemens costs - £24.9m
  • Consultancy - £8.4m
  • BBC staff - £6.4m
  • Other - £2.3m

There is NO reference to a prime contractor, only “contractors” which seems to suggest that these were individuals NOT a large computer systems contracting entity.  There is also reference to “Consultancy” but no reference to which firm or firms and then “IT” presumably applies to other computer technology not supplied by Siemens – overall an interesting mish-mash that already points to the reasons why failure occurred.  Not that having a large IT company like IBM necessarily guarantees a better result, as BMW (BMW owners vent anger at month’s long wait for spare parts – Bloomberg)_ and Bridgestone (IBM Rips Into Bridgestone Over $600 Million Lawsuit – Business Insider) have both learned in the recent past.

And the fact that IBM have seemingly walked away from BMW unscathed, in its own way, offers an interesting insight into the business computer systems industry, an industry characterized by more high profile investment failures than ANY other area of human endeavour in the commercial arena.

While these major IT failures are taking place the Crossrail project in London with its 10 new stations and 21 kilometres of twin railway tunnels under the centre of London dwarfs these projects in scale and complexity, yet the most superficial inspection indicates that the tunnels are where the designers said they would be and they line up with the stations.  Further, global experience with projects of similar complexity indicates that Crossrail WILL deliver what it said it would, more or less on time and more or less on budget and, even if it does go over budget and deadline it will still work as planned.

So, what is different?

Ø  Large highly specialized contractor organizations with a track record of delivering;

 

Ø  Large highly specialized design organizations with a track record of delivering;

 

Ø  A close to zero social tolerance for failure of projects of this nature;

 

Ø  Statutory regulation and corresponding professional regulatory bodies that prevent inadequately trained and inexperienced engineers and technicians working on such projects and which impose harsh sanctions for incompetence or negligence.

“Incompetence and negligence?’ – YES! Ultimately the failure at the BBC has to be the consequence of incompetence and negligence, amongst other factors – incompetence being the lack of knowledge and experience necessary to successfully execute a project of this nature and negligence because it is negligence to embark on a project of this nature without the technical certainty that you know what you are doing and have the necessary checks and balances in place to ensure a successful outcome.  Notice that I say “ensure a successful outcome” NOT “fluke a successful outcome” – success is the necessary consequence of a systematic, disciplined and informed engineering endeavour that is designed NOT to fail.  Failure is the inevitable consequence of incompetence and negligence.

There is a fundamental principle that should apply in a case like the BBC’s failed DMI project in order to prevent failure – there should be a lead solutions architecture company conceptualizing and framing the solution design; a lead systems engineering company designing the solution; and a lead solutions construction company building the solution.  All three of these organizations should deploy teams of highly experienced personnel with formal training and certification in the disciplines necessary for engineering solutions of this nature.  And there should be tension between these three organizations, because all three (but particular the solution architecture firm) should be looking out for the best interests of the client.

“But!”

“Engineering!!”

“James, this is the IT industry, NOT the engineering industry!”

That is precisely the point.

The design and development of systems of ANY sort IS an engineering endeavour

The American Engineers' Council for Professional Development has defined "engineering" as “The creative application of scientific principles to design or develop structures, machines, apparatus, or manufacturing processes, or works utilizing them singly or in combination; or to construct or operate the same with full cognizance of their design; or to forecast their behavior under specific operating conditions; all as respects an intended function, economics of operation and safety to life and property.” (Wikipedia)

This is EXACTLY what the BBC embarked on with DMI, the engineering of a solution for managing their digital material.

The fundamental problem is that they failed to embark on the project as an engineering project and they failed to use engineers to manage the project.

But there IS a catch and that is that engineers do NOT know how to manage this sort of IT project and so, if you let engineers loose on their own, you get problems as well.

You see, Information Technology projects are extremely abstract.  They involve software that is effectively invisible working with human beings who are for the most part, unstructured and work in unpredictable ways and there are many other complexities such that “IT Mythology” constitutes 30% of why such projects fail – IT Mythology is the mistaken belief that computer systems are in some sense magical and work on their own, provided you sort of hack it, see my website for a discussion of this and the other factors that cause IT investment failure.

What is particularly notable about the reports concerning the BBC’s DMI project crash, like so many project crashes of this nature, is that there is NO evidence of any professional body or statutory body investigating the failed project in order to establish what went wrong and to develop policies, disciplines, training material, licensing requirements and other safeguards in order to prevent recurrence – there is NO “air crash investigation” to cite the popular TV documentary.

There IS a report by PriceWaterhouseCoopers which finds “"PwC has concluded that weaknesses in project management and reporting and a lack of focus on business change... meant that it took the BBC too long to realise that the project was unlikely to deliver its objectives," it said in a statement” – this hardly points to a rigorous and tough engineering root cause assessment of why failure occurred!  But then PWC are NOT an engineering company and they are deeply involved in the IT industry themselves with their own history of failures, so hardly in a position to deliver an objective assessment of the situation.

What I am referring to is a statutory body with teeth and the willingness to call a spade a spade and name incompetence when it encounters it.

In fact, there is NO indication of any intention to establish such a statutory body or such a professional body, presumably because it has NOT yet occurred to government that they have an obligation to promulgate such legislation and institute such controls.  And the industry is in part too fragmented and in part making too much money out of failure to care about doing anything about the situation.  After all, of the order of 70% of IT projects fail outright, as in they never see the light of day, and a further 20% materially fail to meet the requirements of the customer, partly because 70% of the components of the 20% are a total failure.  This leaves us with 10% of all projects that at some material level meet client expectations and even then the indications are that less than 5% of ALL projects MEET or EXCEED the expectations held by clients at the time that the project was authorized.

So the IT industry is enormously wealthy in significant measure out of gross inefficiency and incompetence – after all, if 70% of projects die before they see the light of day it is easier to bury them quietly than to make a fuss about it and expose one’s failure to one’s shareholders and competitors let alone a drubbing from the Public Accounts Committee.

Until government and industry join forces to form a body to fully dissect failures of this nature AND establish suitable professional training, certification and licensing of consultants and vendors, the carnage will continue.  Attacking and condemning the responsible executives is well and good, but if they have NO resource to prevent such failures failure WILL continue to be the norm!

I have been investigating and documenting the causes of business information system failure and what is required to prevent failure from an engineering perspective for 25 years.  I formally published my findings in 2004 and have been applying these findings since then.  The challenge is for someone with influence to decide that failures of this nature are NO longer acceptable and start the ball rolling to produce legislation introducing strict and onerous regulation of the business information systems industry and its practitioners.

Such failures as the BBC’s DMI project are ENTIRELY preventable and high value successful outcomes are ENTIRELY achievable.

 

Dr James Robertson PrEng

The BMW ATLAS SAP EWM project -- spare parts delivery problems -- an illustrative example of the factors causing failure

To illustrate how these factors work in practice I would like to return to the BMW situation referenced at the start of this article, visit http://www.bloomberg.com/news/2013-08-27/bmw-owners-vent-anger-at-months-long-wait-for-spare-parts.html for details.

Google “BMW Owners Vent Anger at Months-Long Wait for Spare Parts” for many more reports.

Ø  The product was the SAP Extended Warehouse Management Software (EWM);

 

Ø  The client was BMW’s main spare parts warehouse;

 

Ø  The implementation consultants were IBM who have reportedly walked away;

 

Ø  The system ran live and immediately there were problems with fulfillment such that reports indicate customers around the world have been waiting for months for repairs;

 

Ø  BMW have been seriously embarrassed, their reputation has been tarnished and, if the problem is not definitively resolved soon, material damage to the brand may well result;

 

The fact that a superior engineering organization such as BMW, installing a supposedly world class product from one of the leading software suppliers in the world, SAP, and assisted by an implementer of the stature of IBM cannot get it right first time should cause all potential purchasers of any form of Business Information System to look seriously at what is presented in this article and seek to apply it rigorously.

 

I contacted the CEO of BMW some weeks ago to offer my services to assist him to identify the root cause of the problem in line with the principles set out above.  I received a response from the executive responsible for after sales service and from the project manager and my offer was then declined.  I again approached the CEO and this time received a reply from the person responsible for internal consulting who rather curtly told me to go away.

 

All three replies demonstrated a complete lack of understanding of the issues that I was raising and, in my opinion, gave a basis for serious concern.  I again approached the CEO and have received no reply.

 

However, from this interaction I have been able to draw some headline inferences which help to demonstrate the relevance of the approach advocated above:

 

Ø  the CEO passed the inquiry on to one of his executives who then passed it on to the project manager à immediately a problem with executive custody at both levels;

 

Ø  the nature of the problem, only some parts are being delayed, when, based on the outcry, with the old system they were fulfilled timeously à indicates that there are problems with the configuration at the level of inaccuracies in the master data, something has not been set up correctly, fundamentally a lack of precision configuration, a human discipline problem;

 

Ø  furthermore a level of irony, the car is in the ditch and it can only be there because of negligence or incompetence on the part of the driver or the support crew but the offer to investigate is passed to the two people who must surely be most accountable for the mess à indicative of a lack of understanding, “we think the machine is not working correctly”, but computers do what they are told and it is unlikely that the problem results from the machine, in other words mythology or someone somewhere might be lying;

 

Ø  the project manager wanted me to have expertise with regard to the software and the industry.  The car is in the ditch because of bad driving but the accident investigator is turned away by the driver and the team manager on the grounds that the accident investigator does not know the engineering details of the engine in the car and of the straight, four lane highway on which the car crashed à mythology or a lack of Engineering Approach in the form of accountability;

 

Ø  the email response from the responsible executive spoke repeatedly of “business process” as though somehow the new system had exposed massively defective business processes that had been lying latent waiting to be exposed.  Problem is that the parts were being fulfilled before the new system was commissioned, judging by the irate complaints of service centers and customers à mythology and tradition or someone is lying to the executive concerned;

 

Ø  clearly there was no Business Simulation Laboratory, if there had been there is no way the system would have been allowed into production;

 

Ø  clearly the “Engineering Approach” was weak or absent, if there had been there is no way the system would have been allowed into production.

 

These are the most obvious inferences that can be drawn from press reports and my interaction with the company.



Random Selection of Articles by Dr James Robertson

Cnf 000 List of Conference and other Public Presentations

Comprehensive list of Conferences and Presentations by Dr James A Robertson
SNw 058 The Critical Human Foundation

Everything we do with business information systems and is dependent on people.  This articles addresses in some detail a diversity of factors that influence the success or failure of business information system projects
Cnf 062 How To Ensure That Software Assets Deliver

Key factors giving rise to business information system investment failure and critical components of ensuring a successful outcome with particular emphasis on executive custody and managing the factors causing failure and the critical factors for success


Dr James A Robertson PrEng

Business Systems NOT delivering?

Call the Business Systems Specialist

Dr. James Robinson

Dr James A Robertson -- has been involved in the effective application of Business Information Systems, including but NOT limited to ERP, since 1987 and in the profitable and effective use of computers in Business since 1981.

Drawing on a diversity of experience, including formal military training in Quick Attack techniques at the Regimental Commander level, Dr Robertson has developed highly effective methods of investigating any sub-optimal Business Information Systems situation -- be it an established system or a stalled project or any other source of Executive frustration -- quickly and concisely diagnosing the root cause of the problem and prescribing concise practical actions that Business Executives can effectively act on see the Pulse Measurement page and also the Sample Reports page for redacted real reports.

He has also developed highly effective methods of strategically enriching systems to unlock the full potential of existing investments, see the Precision Configuration page and couples this to architecting small pieces of clever software that harness the full potential of your investment, see the Software page.

If you are having problems with your systems, your project or your IT Department, call The Business Systems Specialist
James@James-A-Robertson-and-Associates.com

Business System Failure is RIFE -- we offer insight into why this happens AND WHAT is required to prevent it.

Failure is at epidemic levels with massive damage done to client companies -- if you are NOT aware of the extent of the problem please visit the About Failure page for a catalog of major failures running to billions of Pounds and Dollars.

All evidence indicates that the established players do NOT know how to deliver stable, reliable high value solutions that WORK.

There HAS to be a better way!

This website provides information relating to that way with a large collection of white papers, presentations, standards documents, etc that you can use to start bringing the situation under control

We also offer high level advisory services with regard to the application of the principles advocated on this website

We offer an ENGINEERING APPROACH to addressing these issues

Click here to read more about the Engineering Approach

By Engineering I mean the formal, structured, highly disciplined, highly systematic, highly practical approach that consistently delivers results in ALL areas of human endeavor where formally trained and certified engineers are the ONLY practitioners permitted to operate -- think large buildings, factories, motor vehicles, aircraft -- highly complex systems that work at a level that we take it for granted that they WILL work and where failure is all but unthinkable and, when it happens, attracts immediate public attention and rigorous investigation directed at ensuring that such failures are prevented in the future -- in fact, everything that the management consulting industry that implements complex software systems is NOT

This approach is discussed further on the Engineering Approach page.

Search Articles

Book -- The Critical Factors for Information Technology Investment Success

In 2003 I undertook an in-depth analysis of all the information and experience that I had gathered with regard to the factors giving rise to Business Information System failure including ERP and general IT and classified this information into a number of categories including "The Factors Causing Failure" and "The Critical Factors for Success" based on this I developed a two day Course "The Critical Factors for Information Technology Investment Success" which is still offered today.

Based on this I wrote the book of the same name, which is available in electronic form here for download:


Random Selection of Articles by Dr James Robertson

Cnf 082 A strategic approach to corporate planning, management and governance

Considerations with regard to governance of information technology and business systems taking account of the abstractness of information technology solutions
Std 009 Procurement: 01 Request for Proposal for Business Systems Solution

This is the heart of the tender and contains a large number of tough clauses that are directed at ensuring a realistic bid with a robust platform for realistic negotiation and a tough contract that is directed at ensuring performance

There is a more detailed version of this document at the end of this page for larger projects with a more detailed procurement process

Cnf 087 Critical factors for strategic business improvement success

A discussion of the factors that give rise to general business improvement success drawing on my experience with business information system and ERP projects
SNw 048 Robust Procurement: Part 2 -- Bill of Services, Laboratory, Go-live Certificate, etc

The importance of a formal bill of services, a business simulation laboratory, the issue of formal certificates including a formal go-live certificate and related matters
Cnf 062 How To Ensure That Software Assets Deliver

Key factors giving rise to business information system investment failure and critical components of ensuring a successful outcome with particular emphasis on executive custody and managing the factors causing failure and the critical factors for success
SNw 041 Strategic Essence: The Missing Link: Part 2 -- Differentiation

A fundamental component of strategy and strategy determination is differentiation, understanding how the organization differentiates itself in the market place and enhancing and strengthening those attributes is a fundamental component of creating high value business information solutions
Cnf 091 Business Process -- Over Rated and Over Stated

Discussion of why the current focus on Business Process Mapping is seriously misplaced and is leading to major inefficiencies and negative project outcomes in the business information systems industry -- concludes that "Business Process Obsession is killing ERP"
Std 026 Old Software IS Viable

Many business information system projects are motivated on the basis that the existing systems are obsolete.  This article challenges that argument with regard to a significant number of systems and presents information that will enable executives and managers to take a pragmatic view of this debate
Cnf 046 Insourcing -- Restructuring the IT Department for Better Business Focus and Increased Effectiveness --Armscor Case Study

Case study of a strategic planning project undertaken to develop a customer service focused IT Strategy for the Armaments Corporation of South Africa, the project used strategic marketing concepts to research business user, business requirements and concerns and convert these into a strategic action plan that was measurable and actionable thereby strengthening the position of the IT Department as a partner with the business

Subscribe to our Newsletter

Click here to send us an email subscribing to our free newsletter -- all articles posted by James Robertson will be emailed to you

Connect with James Robertson on LinkedIn

James has a very detailed profile on LinkedIn should you require further information about him.

You can also connect with him on LinkedIn at http://www.linkedin.com/in/DrJamesARobertsonERPDoctor

James has an open networking profile -- click on "Connect" and use email address James@LinkedIn-at-JARA.com.

Contact Us

You can contact us on

Email: James@James-A-Robertson-and-Associates.com

LinkedIn at http://www.linkedin.com/in/drjamesarobertsonerpdoctor

Facebook at https://www.facebook.com/james.a.robertson.393

Mobile: +44 (0) 776-862-2875

Landline: +44 (0) 207-059-0007

Fax: +44 (0) 844 774 4580

Articles by James A Robertson and Associates

There is a large body of white papers, articles and other content produced by Dr James Robertson available on this website

Please click here to visit the detailed listing of articles

ArticleTagCloud for Articles Published by James A Robertson and Associates

7 steps to FIX your ERP      80:20 regarding software replacement      aborted projects      abstract      abstractness      accounting      actionable      adjudication      Advantage Data Transformer      advisory      agreement      all possible classifications      all reports      all software elements required      all spreadsheets      all tasks required to execute the project      Alpha Omega      analysis of data      analytics      animation      answers to the questions we have NOT yet thought to ask      Armscor      arrogant ignorance      art of strategic business information system project leadership      ASCO      attendance register      attorney      audit      audit cost reduction      bankrupt organizations      basis for achieving alignment      basis of payment      basis of pricing      better way      bid adjudication      bid adjudication score sheet      bid compliance      bid compliance checklist      bill of materials      bill of services      BIS      BIS failure      BIS success      boots in the mud      BPM      BPM dangerous      BPM distracting      BPM ineffective      brainstorming      break it until it does NOT break anymore      break it until it will NOT break any more      budget      budgeting      business engagement      business executives      business improvement      business information system      business information system failure      business information system success      business information system taxonomies      business information systems      business information systems procurement      business information systems projects      business integration      business intelligence      business intelligence models      business knowledge and experience      business participation      business process      business process mapping      business requirements focused      business requirements specification      business simulation laboratory      business systems      business systems laboratory      business understanding      by the book      care      case studies      case study      CEO      CEO -- project leader communication      CEO as custodian      CEO definite views      certificates      challenges      challenging presentations      change facilitation      change for strategic reasons      chart of accounts      classification schemes      clever software      client changing scope      client compact      clinical codes      coaching      Cobol      COBOL CAN be retained      Cobol still viable      code schemes      coding conventions and standards      cognitive span      collapse      communication      competitive advantage      competitive advantage through precision configuration      competitiveness      compiler      complexity      compliance      compliance checklist      comprehensive testing      Compuware      conference speaking      conferences      confidentiality      configuration      consultant NOT delivering what required      contract      contract certificates      contract law      contracting      contractors      corporate planning      cost      cost-quality-time      CPT 4      CPT4      critical factors      critical factors for IT investment success      critical factors for success      critical factors for technology success      critical human foundation      critical issues      critical issues analysis      critical requirements      CRM Risk Control      cubic business model      custom development      custom software      customer focused      data      data content      data engineering      data entities      data warehouse      DB2      definitions      design against failure      design and development      design for success      determination of strategic essence      determining strategy      diagnostic code      diamonds in the dust      differentiated      differentiation      diffusion of innovations      discovery      dislike of failure      dispute resolution      do NOT change systems because of alleged software redundancy      do things competitors could NOT do      document pack      Dr James A Robertson      Dr James A Robertson PrEng      dramatic benefits      dramatically improved strategic management information      driver of success      Dunning-Kruger effect      ease of use      economic collapse      economics      effective communication      effectiveness      efficiencies      efficiency      efficient filing of emails      eliminate light bidders      email      engineer against failure      engineered data      engineering      engineering approach      engineering approach to strategy      engineering failure      engineering laboratory      engineering services      engineering solution design      engineering techniques      enhance differentiators      enhance the differentiators      enhancing the value of your present investment      ensuring project success      enterprise resource planning      ERP      ERP configuration      ERP failure      ERP procurement      ERP success      ERP taxonomies      ERP value      essence IS different      essence of business      essence of the business and how it thrives      ethics      examples      exceptionally bad code design      executive briefing      executive briefings      executive custody      executive decision support      executive engagement      executive forum      executive frustration      expose hidden agendas      facilitation      factors causing failure      factors causing IT investment failure      factors causing technology failure      factors to manage for success      failure      failure to address soft issues      fashion      file table of contents      Financial Information System      financial information systems      financial management      fixing your ERP      focus for projects      folder design      foundation for delivery      full training      functional entities      future      Gantt Chart      gap analysis      general ledger      George Paton      go-live      go-live certificate      governance      governance = care      governance failure      group consolidation      Group Consolidation Chart of Accounts      growth      gut feel factors      hand holding      harshest judge of governance      hate failure      head count reduction      health management software      hierarchies      high level requirements      high road      high value      high value implementations      high value solutions      high value systems implementation      highly effective chart of accounts      holistic view of solution      how do you achieve executive custody      how the organization differentiates itself      how to      how to do it      huge opportunity      human foundation      hype      Hyperion      IBIS      ICD 10      ICD10      importance of executive custody      improved management information      in-box rules      incremental enhancement of existing systems      ineffectiveness      inefficiency      information required from third party suppliers      information technology      information technology failure      Information Technology Strategy      information technology success      Informix      in-house courses      innovative software solutions      innovator      inside head of CEO      insightful      instructions      intangible      integrated business information system      integrated view of business      integrity      intelligent data      interactive training material      interview      invitation to bid      isolated CEO = explosion      IT      IT and strategy      IT Audit      IT failure      IT governance      IT lies      IT management      IT mythology      IT non-performance      IT people who lie      IT personnel socialization      IT procurement      IT projects that fail      IT strategy      IT systems      IT systems procurement      IT the harshest judge of governance      James Robertson      Jof Nelson      key performance indicators      Kirsten Speer      knowledge management      laboratory      lack of an engineering approach      lack of precision configuration      lack of strategic alignment      lawyer      leadership      legal agreement      legislation      lies      list of required software      listen carefully      litigation      logical entities      loss information      low road      loyalty      MacDonald      maintain code schemes      maintenance      maintenance management      Malcolm McDonald      management      management information      managing contractors      manual      marketing hype      master data      master data classifications      master test data      mature facilitation      mature facilitator      measurable      measures of alignment      mentoring      Microsoft Outlook      misrepresentation      missing link      mistique      morals      Munich      mystique      mythology      new future state      New South Africa      no drill down      non-disclosure      NOT classic project management      obsolete is a fashion statement      obsolete software      old software IS viable      once software works it always works      on-line seminars      opportunities      opportunity to turn the economy around      organizing Microsoft Outlook      orientation of IT staff      own business experience      passion to enable clients to thrive      people are part of the system      personality matrix      planning      platform for a tough contract      precisio      precision      precision configuration      precision configuration advisory      precision configuration leadership      precision data      precision taxonomies      Predictive Index      preparatory steps      prescribed table of contents      presentation technique      presentations      preventing failure      preventing falure      preventing project failure      pricing      principles      problem statement      procedure code      process      processor ignorant of language      procurement      procurement timeline      professional speaker      Professional Speakers Association of Southern Africa      profitability      programming languages are for the programmer      project facilitation      project leader      project leader -- CEO communication      project leadership      project management      project management IT project management      projects      prove it works      PSASA      psychology      psychometrics      public conferences      public presentations      public speaking      Pulse Measurement      quality      REAL issues in Business Information Systems      REAL value      recognizing failure      redaction      reduced audit costs      reduced head count      reference documents      Reg Barry      regulatory body      relationship Almighty      relationship orientated      remediation of existing systems      Rennies Group      reports      reports not reliable      request for proposal      requirements specification      results orientated      RFP      right things      rigorous process      rigorous strategic planning      risk management      Robert Priebatsch      robust business information systems procurement      robust business systems procurement      robust contracts      robust procurement      robust solutions      SAICE      SAP ABAP is similar to COBOL      scheduling procurement      scientific professional      score sheet      screen design      seminars      SEPT      service orientated      Service Orientated Architecture      simple techniques to enhance business information systems value      simulation      sloppy configuration      SOA      socialization      software      software assets      software design      software does NOT wear out      software is instructions for the bricklayer      software schedule      software specification      software specification standards      solution experience      solution knowledge      South Africa      South African Institution of Civil Engineering      speaking      Spirit Led      standards      strategic      strategic advisory      strategic alignment      strategic analysis      strategic analysis and design      strategic business improvement      strategic custom development      strategic definition      strategic discovery      strategic driver      strategic driving force      strategic engineered precision configuration      strategic engineered precision taxonomies      strategic essence      strategic financial information      strategic gap analysis      strategic governance      strategic information      strategic management      strategic management information      strategic plan      strategic planning      strategic project leader      strategic snapshots      strategic software      strategic solution architect advisory      strategic solution architect leadership      strategic solution architecture      strategically designed chart of accounts      strategy      strategy defined      strategy focused planning      Strategy Snapshot Toolset      StratGap      StratSnap      strengthen differentiators      structured analysis      structured chart of accounts      substantial management information      succeed by engineering against failure      success      successful deployment      survive      system knowledge and experience      table of contents      tailored presentations      take notes      taxonomies      taxonomy      taxonomy software      technology      technology failure      technology issues      technology management      tender document pack      tender pack      tender pack table of contents      test data      testing      The Critical Factors for Information Technology Investment Success      the Critical Factors for Success      the essence of the business      the essence of the business and how it thrives      the essence of the organization and how it thrives      the factors causing failure      the first hour      The REAL Issues in Business Information System success      things right      third party suppliers      third world countries      thrive      time      tipping point      tough certificates      tough contract management      tough contracts      tough procurement      tough terms      training      training material      treatment code      understanding of data      understanding the engineering approach      Uniface      unlocking value      use different languages for new components      V3 Consulting Engineers      validation data      value      versus process      video      webinar      webinars      weighted factors      what is executive custody      what is strategy      what is the essence of this organization and how does it thrive      what to do      where is IT going      why executive custody is required      why the organization exists and how it thrives      why your business information system is NOT delivering and HOW to FIX it      why your ERP is NOT delivering and how to fix it      workflow      writer     

Table of Contents

Home

About Dr James A Robertson PrEng -- The Business Systems Doctor -- and Other Topics

Catalogue of Major Business Information System Failures

About the Engineering Approach

James Robertson's Value Add

Attributes of a HIGH VALUE solution

Recognizing Business System Failure

The Critical Human Foundation

Old Software IS Viable

From South Africa

Competencies of Dr James A Robertson PrEng

About Professor Malcolm McDonald

Table of Contents

About my relationship with the Almighty Creator, Yah the Eternally Self-Existing

Comments relating to the Business Systems Industry and other topics

Testimonials and other positive material regarding James Robertson

Reference Articles

List of Articles

Article Catalogue

Achieving High Value Business Information System outcomes

Executive Custody -- What is it and HOW do you get it?

The REAL Issues in Integrated Business Information System Success

Part 1: Introduction

Part 2 -- Mythology and Lack of Executive Custody

Part 3 – Strategic Alignment and Precision Configuration

Why your ERP is NOT delivering and HOW to FIX it

IT Project Management

Pulse Measurement

CEO Anthony Lee Comments on his experience of the Pulse Measurement

No Charge Guarantee on the Pulse Measurement Service

Examples of Pulse Measurement Outcomes

Critical questions regarding the Pulse Measurement™

The Pulse Measurement Workflow

The Critical Factors for Business System (ERP+) Investment Success in the Pulse Measurement

Indicative Pulse Measurement Durations

What is a JAR&A Pulse Measurement?

Survival of the fittest – why it makes sense to measure the pulse of your business

Examples of Pulse Measurement Outcomes over 24 years

Sample Pulse Measurement Reports

Strategy

Strategic Essence: The Missing Link in Business Information Systems

Strategic Essence: Overview

Strategic Essence: Part 1 -- Strategy Defined

Strategic Essence: Part 2 -- Differentiation

Strategic Essence: Part 3 -- The Essence IS Different

Strategic Essence: Part 4 -- The Essence should be the Point of Departure

Strategic Essence: Part 5 -- Discovering Strategic Essence

Strategy -- the Essence of the Business: What is it and how do you develop actionable strategic plans?

Simple Steps to Increase the Strategic Value of your ERP Investment

Free Strategic Snapshot Toolset and Manual

A strategy focused planning system beyond traditional budgeting

Tough IT and ERP Procurement and Contracting that Works

Robust Business Systems Procurement

Part 1 -- Introduction

Part 2 -- Bill of Services, Laboratory, Go-live Certificate, etc

Part 3 -- Executive Engagement, Bid Compliance, Adjudication and other matters

Procurement Documents

Guidance and Advisory Services

The Art of Project Leadership

Why Regular Communication with the CEO is Vital

The Business Simulation Laboratory

Precision Configuration and Strategic Business Information Architecture

Precision Configuration based on Strategic Engineered Precision Taxonomies

The JAR&A Cubic Business Model

Highly Structured Strategic Chart of Accounts -- a Vital Element of your Corporate Information Arsenal

The Product Catalogue -- an Essential Element of any Precision Configuration

Attributes -- answers to the questions you have NOT yet thought to ask

Case Studies of Notably Successful Projects with high value Precision Configuration

092 Doing things differently and better -- ASCO Case Study 2-- BPM Summit 2013

088 Strategic ERP Invesment -- ASCO Case Study -- Service Management Conference and Exhibition Africa

026 Information Architecture and Design of FIS for Rennies Group -- Financial Information Systems Conf

018 CRM Risk Control: Designing and Implementing an Integrated Risk Mgmt Sys -- Integrated Risk Mgmt Conf

011 V3 Consulting Eng: Benefits of MIS to Professional Practice -- SAICE 15th Ann Conf on Computers in Civil Eng

Strategically Enriching your Business Information Systems

Part 1 -- Introduction

Part 2 -- Principles of Data Engineering

Part 3 -- Steps in applying these recommendations

Simple Steps to increase the strategic information value yield from your Business Systems Investment

The Full JAR&A Taxonomy Manual

Part 1: Introduction, Problem Statement, Definitions and Examples

Part 2: Why Use JAR&A, Required Knowledge and Experience, Cubic Business Model and Chart of Accounts and Taxonomy Software

Part 3: How to do it, Case Studies and White Papers and other References

Example General Ledger Manual

Business Process -- Irrelevant, Distracting and Dangerous

The RIGHT Approach

Custom Strategic Software Design and Oversight of Construction

Standards for Custom Software Specification

What IS Software?

IT Effectiveness

Organizing Outlook

Critical Factors for I.T. Success

A Moral and Ethical Dilemma -- Systems that Fail

Case Studies examining Business Information System failures

The BBC Digital Media Initiative Debacle

The Bridgestone -- IBM Conflict

Speaking and Training

Showcase of Conference Presentations

Most Viewed Presentations

Briefings and Seminars

Why your ERP/BIS is NOT delivering and HOW to FIX it

ERP and IT Procurement that Delivers Results

The Critical Factors for IT and ERP Investment Success

Other Seminars

Conferences and Public Presentations

Conferences 80 to 99 -- 2009 to Present

Conferences 60 to 79 -- 2005 to 2009

Conferences 40 to 59 -- 1996 to 2005

Conferences 20 to 39 -- 1994 to 1996

Conferences 01 to 19 -- 1989 to 1994

On-Line Seminars (Webinars)

Webinar on Preparing and Presenting Webinars

Contacting James A Robertson and Associates Limited