• Login

Articles by James A Robertson and Associates

Std 018 Procurement: 09 Table of Contents of Submission
Created by James on 10/22/2014 3:45:41 PM

The Table of Contents of the Tender Submission is prescribed in detail in order to ensure that different bids can be lined up against one another and accurately compared


The Table of Contents of the Tender Submission is prescribed in detail in order to ensure that different bids can be lined up against one another and accurately compared



Table of Contents for Offer Document Pack

 

Offer Volume 1

Detailed Offer

The offer is to be presented in large Lever-Arch files (5 sets) with the following contents – files and sections are to be numbered in accordance with this schedule.  The pages in the entire file set are to be numbered on a per section basis with a Table of Contents referring to these page numbers.  Page numbers may be handwritten.

This document is for the convenience of bidders and to ensure that all bid documents are structured in a similar manner for ease of evaluation.  In the event of a documentation requirement specified elsewhere not being catered for here, that requirement can either be catered for in the comments on individual bid pack documents or in the Other Documents section, Section 6 of this document.

The pricing schedule in the form of the fully completed Bill of Services and the Software Schedule are to be bound as a separate A3 volume.

The entire document pack is also to be supplied electronically on CD (5 CDs – 1 per document set) with the same structure as this Table of Contents with all items in Adobe pdf format.

The Excel spreadsheets for schedules prepared in Excel must be on the CD as well as in pdf format. 

 

1. Contractual Summary

The core contractual documents that summarize the entire offer

1.1 Covering Letter

Covering letter including contact details of bidding company, bid company contact person, etc

 

1.2 Signed Confidentiality and Non-Disclosure Agreement

 

1.3 Overview of the Offer

A few pages setting out the offer in summary highlighting the key elements of the offer and what differentiates it

 

1.4 Financial Summary of the Offer

A concise document setting out the commercial proposal and headlines of the offer.

 

1.5 Table of Contents of the entire file set with page numbers (pages can be manually numbered)

 

1.6 Certificate of Compliance and Acceptance

Certificate by a Director of the bid company signifying compliance with the terms of the bid and acceptance of the terms of the bid – see template provided in Section 10 of this file.

 

1.7 Board / EXCO Resolution

Resolution by the Board or Executive Committee of the Prime Contractor mandating the Bidding Director to contract the Bid Company.

 

1.8 Summary Financial Statements for Bidding Company (or copy of Annual Report)

Summary Financial Statements or Annual Report to demonstrate that the Bidding Company has the financial muscle and balance sheet to underwrite its offer.

 

1.9 Formal Proposal with regard to safe guarding Client Interests with regard to a twenty year investment life

Document that addresses the issues of sustainability of the software investment for a minimum of 20 years and the Right to Maintain and Repair is recognized.

 

1.10 Confirmation that the Request for Proposal document has been read and understood

 

1.11 Confirmation that the Headline Requirements Specification document has been read and understood

 

1.12 Gantt Chart for the project


 

2.  Further Contractual Information

Further contractual documents relating to the offer:

      2.1 Other information requested during the bid process

 

2.2 Written guarantee that with proper configuration the software will meet the requirement

 

2.3 Written guarantee that the Implementer carries Professional Indemnity insurance sufficient for a project of this magnitude and accepts the role of trusted professional advisor – letter from insurer

 

2.4 Written guarantee by Implementer that they will sign a legally enforceable go-live readiness certificate and will accept liability if configuration related issues cause commissioning damage

 

2.5 Written guarantee by Software Vendor/s that they will sign a legally enforceable go-live readiness certificate and will accept liability if software related issues cause commissioning damage

 

2.6 Software Cost Summary

Schedule listing all software proposed, whether it is a core offering or a third party specialist add-on product and names of specialist team to support the software.

The detailed schedule is to be bound with the Bill of Services as an A3 document

 

2.7 Bill of Services Cost Summary

Signed Bill of Services Summary containing the FINAL offer price – use Excel schedule provided – the main schedule is to be submitted as a separate A3 bound document

 

2.8 Assumptions made in the Bill of Services Costing

 

2.9 Hardware Cost Summary

Schedule listing all hardware proposed

 

2.10 Schedule of Software License Costs for the first five years

Annual license fees for software for first five years and maximum annual increase thereafter

 

2.11 Schedule of Team Members and Rates

Schedule listing the Key Team Members who will form the backbone of the team and confirming that they will be bound to the contract subject to commencement of work on the advertised date.  This schedule must also list the rates for the team members.  Details regarding team members are to be provided in section 3.

 

2.12 Signed and Completed Bid Compliance Checklist

Signed and initialed schedule Bid Compliance Checklist.  Every item in the Bid Compliance Checklist must be initialed, either in the “Yes” column to signify compliance or the presence of the required item or in the “No” column to signify non-compliance or the absence of the item or non-acceptance.

Client reserves the right to disqualify any offer that contains items excluded on the Compliance Checklist or elsewhere.

 

2.13 Signed Bid Adjudication Form

Rating form signed to signify that the basis of adjudication has been noted and taken into account in the proposal and that all items on the schedule have been addressed

 

2.14 RFP Exclusions

Document listing any items in the RFP that the bidder is NOT prepared or able to comply with and, where appropriate, suggesting alternative terms or measures.

Bidders must be aware that Exclusions or Non-Compliance may result in the bid being disqualified.

 

2.15  Exclusions from Headline Requirements Specification

Document listing any items in the Headline Requirements Specification that the bidder is NOT prepared or able to comply with and, where appropriate, suggesting alternative terms or measures.

Bidders must be aware that Exclusions or Non-Compliance may result in the bid being disqualified.

 

2.16 Bill of Services Exclusions

Document listing any items in the Bill of Services that the bidder is NOT prepared or able to comply with and, where appropriate, suggesting alternative terms or measures.

Bidders must be aware that Exclusions or Non-Compliance may result in the bid being disqualified.

 

2.17 Software Schedule Exclusions

Document listing any items in the Software Schedule that the bidder is NOT prepared or able to comply with and, where appropriate, suggesting alternative terms or measures.

Bidders must be aware that Exclusions or Non-Compliance may result in the bid being disqualified.

 

2.18 Exclusions from the Reference Documents Pack

Document listing any items in the Reference Documents Pack that the bidder is NOT prepared or able to comply with and, where appropriate, suggesting alternative terms or measures.

Bidders must be aware that Exclusions or Non-Compliance may result in the bid being disqualified.


3. Bid Professional Team

Contractual documentation relating to all professional team members – for the first round of bidding only the senior team members are required:

3.1 Implementer Project Director

3.1.1 Certificate of Commitment

Certificate signed by the Prime Contractor and the team member binding the team member to the project for the duration of the contract – template provided.

 

3.1.2 Summary

One page summary of why this person has been put forward for this role.

 

3.1.3 CV

 

3.1.4 Other supporting documentation

 

3.2 Implementer Team Leader

Sections as above.

 

3.3 Implementer Project Manager if different to Team Leader

Sections as above.

 

3.4 Implementer Strategic Solution Architect

Sections as above.

 

3.5 Implementer Transportation Team Leader

Sections as above.

 

3.6 Implementer Finance and ERP Team Leader

Sections as above.

 

3.7 Other team members -- Provisional

The remaining names are to be put forward on a provisional basis with the understanding that their availability may change prior to award of the contract and they may be substituted.  These names are provided to substantiate that the bidder has the resources to fully undertake the project.

 

4. Details of the Core Software Offering

Information relating to the core offering.

4.1 Certificate of Compliance

Certificate stating that based on the available knowledge the software proposed is capable of meeting the requirements of Client – use template provided.

 

4.2 Overview of the Product Suite on a Module by Module Basis

Follow the hierarchy used in the Request for Proposal

 

4.3 Detailed Information on a Module by Module Basis


5. Details of the ERP and Finance Software Offering

Information relating to the ERP and Finance offering.

5.1 Certificate of Compliance

Certificate stating that based on the available knowledge the software proposed is capable of meeting the requirements of Client – use template provided.

 

5.2 Overview of the Product Suite on a Module by Module Basis

Follow the hierarchy used in the Request for Proposal

 

5.3 Detailed Information on a Module by Module Basis


6. Third Party Software and Associated Professional Teams

Contractual documentation relating to all third party software contributions proposed

6.1 Module Name – Software Product Name – Support Company Name


6.1.1 Certificate of compliance

Certificate signed by the lead contractor and the sub-contractor binding the software company and the service provider to the project and confirming that the software meets the headline requirements as far as can be determined – use template provided.

 

6.1.2 Overview of the software and service

Why this product has been put forward and the qualifications and experience of the implementers.

 

6.1.3 Detailed information on the professional team

 

6.1.4 Detailed information on the software

 

6.2 Ditto for the next third party module, etc

 

7. Other Information

Any other information that bidders consider appropriate or that is requested elsewhere and not explicitly provided for here.

 

8. Full document set on CD

A full set of the offer documentation, including the initialed copies, is to be provided on CD at the end of the main offer volume – there must be a CD in each of the five sets.


 

Offer Volume 2

Detailed Bill of Services and Software Schedule in Separate Binder in A3 format

 

Detailed Bill of Services and detailed Software Schedule bound in a separate A3 ring binder or file.

These schedules may be enhanced by the addition of additional rows and columns in designated locations in order to ensure that the offer is properly documented such that these schedules can form a key component of the final contract.

Comments and additional lines and columns required to align the methods of the bidder with the structure required by Client are to be inserted in the masters of the Bill of Services and Schedule of Software.

The hard copy documents in the Master set must be signed in full on the last page and initialed on every page.  The other sets can contain photocopies.

Copies of the spreadsheets must be supplied on the disk referred to above.


 

Offer Volume 3

Annotated Copies of Documentation

Bidders will be supplied with electronic copies of all the documents making up the Client Request for Proposal and are required to comment in highlighted text boxes within the body of these documents in terms of the details of their offer, how the offer complies, concerns they may have, etc

1.  Annotated Copy of the Request for Proposal

Annotated copy of the Request for Proposal – bidders will receive a copy of the document in MSWord format and are required to insert highlighted text boxes as appropriate in which they offer comments and responses in terms of how their offer will comply with the specific item to which the annotation refers.

These comments are only required where the other documentation does not address a particular point.

 

2.  Annotated Copy of the Headline Requirements Specification

Annotated copy of the Headline Requirements – bidders will receive a copy of the document in MSWord format and are required to insert highlighted text boxes as appropriate in which they offer comments and responses in terms of how their offer will comply with the specific item to which the annotation refers.

 

3.  Annotated Copy of the Reference Documents Pack

Annotated copy of the Reference Documents Pack – bidders will receive a hard copy of the document set and an electronic set on CD.

Bidders are required to insert notes as appropriate on the Reference Pack schedule in terms of how their offer will comply with the specific item to which the annotation refers or where there are exceptions or exclusions or suggested alternative approaches.


 

Offer Volume 4

Signed copies of the entire Request for Proposal Pack

Bidders are required to submit a copy of the Client Request for Proposal Pack signed in full on the front cover and initialed on every page of EVERY DOCUMENT to signify acceptance.

The copy with original signatures must be in a clearly marked “Master Set” – the other sets can contain photocopies.

Scanned copies of each of these signed documents are to be included on the Offer CD.


Download 09 Table of Contents of Submission in Microsoft Word docx format


print
[MAKERATING] The comment feature is locked by administrator.
Sort by:
Return


Random Selection of Articles by Dr James Robertson

Cnf 082 A strategic approach to corporate planning, management and governance

Considerations with regard to governance of information technology and business systems taking account of the abstractness of information technology solutions
Std 024 The ART of Strategic Business Information System Project Leadership

The general tendency is to think in terms of Project Management for business information systems projects and the reality of many business information systems Project Managers is that they are administrators rather than strategic leaders.  This article discusses the role of the Strategic Business Information Systems Project Leader as effectively an interim executive who reports directly to the Chief Executive and acts as an advisor, agent and proxy for the CEO in managing the entire integrated business information systems project to achieve a high value business outcome

Std 012 Procurement: 04 Procurement Timeline and Diary

The procurement timeline is a relatively simple Gantt Chart -- I lay it out in Excel, it is quick and serves the purpose, see the sample attached
The goal of the timeline is to set out the overall timing of the procurement process in sufficient detail that all parties are fully aware of the sequence of events that is planned so that they can schedule accordingly
Std 004 Procurement - 00a Approach and Instructions for Completion

Overview of the procurement approach and instructions for completing the tender document pack

Subscribe to our StratNews newsletter

Click here to send us an email subscribing to our free newsletter -- all articles posted by James Robertson will be emailed to you

Dr James A Robertson PrEng The ERP Doctor

Business Systems NOT delivering?

Call the Business Systems Specialist

Dr. James Robinson

Dr James A Robertson -- has been involved in the effective application of Business Information Systems, including but NOT limited to ERP, since 1987 and in the profitable and effective use of computers in Business since 1981.

Drawing on a diversity of experience, including formal military training in Quick Attack techniques at the Regimental Commander level, Dr Robertson has developed highly effective methods of investigating any sub-optimal Business Information Systems situation -- be it an established system or a stalled project or any other source of Executive frustration -- quickly and concisely diagnosing the root cause of the problem and prescribing concise practical actions that Business Executives can effectively act on see the Pulse Measurement page and also the Sample Reports page for redacted real reports.

He has also developed highly effective methods of strategically enriching systems to unlock the full potential of existing investments, see the Precision Configuration page and couples this to architecting small pieces of clever software that harness the full potential of your investment, see the Software page.

If you are having problems with your systems, your project or your IT Department, call The Business Systems Specialist
James@James-A-Robertson-and-Associates.com

Business System Failure is RIFE -- we offer insight into why this happens AND WHAT is required to prevent it.

Failure is at epidemic levels with massive damage done to client companies -- if you are NOT aware of the extent of the problem please visit the About Failure page for a catalog of major failures running to billions of Pounds and Dollars.

All evidence indicates that the established players do NOT know how to deliver stable, reliable high value solutions that WORK.

There HAS to be a better way!

This website provides information relating to that way with a large collection of white papers, presentations, standards documents, etc that you can use to start bringing the situation under control

We also offer high level advisory services with regard to the application of the principles advocated on this website

We offer an ENGINEERING APPROACH to addressing these issues

Click here to read more about the Engineering Approach

By Engineering I mean the formal, structured, highly disciplined, highly systematic, highly practical approach that consistently delivers results in ALL areas of human endeavor where formally trained and certified engineers are the ONLY practitioners permitted to operate -- think large buildings, factories, motor vehicles, aircraft -- highly complex systems that work at a level that we take it for granted that they WILL work and where failure is all but unthinkable and, when it happens, attracts immediate public attention and rigorous investigation directed at ensuring that such failures are prevented in the future -- in fact, everything that the management consulting industry that implements complex software systems is NOT

This approach is discussed further on the Engineering Approach page.

Book -- The Critical Factors for Information Technology Investment Success

In 2003 I undertook an in-depth analysis of all the information and experience that I had gathered with regard to the factors giving rise to Business Information System failure including ERP and general IT and classified this information into a number of categories including "The Factors Causing Failure" and "The Critical Factors for Success" based on this I developed a two day Course "The Critical Factors for Information Technology Investment Success" which is still offered today.

Based on this I wrote the book of the same name, which is available in electronic form here for download:

Connect with James Robertson on LinkedIn

James has a very detailed profile on LinkedIn should you require further information about him.

You can also connect with him on LinkedIn at http://www.linkedin.com/in/DrJamesARobertsonERPDoctor

James has an open networking profile -- click on "Connect" and use email address James@LinkedIn-at-JARA.com.

Contact Us

You can contact us on

Email: James@James-A-Robertson-and-Associates.com

LinkedIn at http://www.linkedin.com/in/drjamesarobertsonerpdoctor

Facebook at https://www.facebook.com/james.a.robertson.393

Mobile: +44 (0) 776-862-2875

Landline: +44 (0) 207-059-0007

Fax: +44 (0) 844 774 4580

Articles by James A Robertson and Associates

There is a large body of white papers, articles and other content produced by Dr James Robertson available on this website

Please click here to visit the detailed listing of articles


Random Selection of Articles by Dr James Robertson

Cnf 087 Critical factors for strategic business improvement success

A discussion of the factors that give rise to general business improvement success drawing on my experience with business information system and ERP projects
Web 05 Organizing Microsoft Outlook

A comprehensive explanation of how to set-up Microsoft Outlook to organize your emails in a manner that makes it easy to handle the full diversity and complexity of emails that executives and managers typically receive
SNw 053 Strategic Essence: The Missing Link: Part 5 -- Discovering Strategic Essence

Overview of a simple and reliable process that you can apply to determine the strategic essence of your organization
Cnf 080 Why your ERP is not delivering and how to fix it

One hour conference presentation regarding the major factors that give rise to ERP investment failure and how to achieve success.

Defines some fundamental principles that are of vital importance to any organization that is implementing or operating any Business Information System

ArticleTagCloud for Articles Published by James A Robertson and Associates

7 steps to FIX your ERP      80:20 regarding software replacement      aborted projects      abstract      abstractness      accounting      actionable      adjudication      Advantage Data Transformer      advisory      agreement      all possible classifications      all reports      all software elements required      all spreadsheets      all tasks required to execute the project      Alpha Omega      analysis of data      analytics      animation      answers to the questions we have NOT yet thought to ask      Armscor      arrogant ignorance      art of strategic business information system project leadership      ASCO      attendance register      attorney      audit      audit cost reduction      bankrupt organizations      basis for achieving alignment      basis of payment      basis of pricing      better way      bid adjudication      bid adjudication score sheet      bid compliance      bid compliance checklist      bill of materials      bill of services      BIS      BIS failure      BIS success      boots in the mud      BPM      BPM dangerous      BPM distracting      BPM ineffective      brainstorming      break it until it does NOT break anymore      break it until it will NOT break any more      budget      budgeting      business engagement      business executives      business improvement      business information system      business information system failure      business information system success      business information system taxonomies      business information systems      business information systems procurement      business information systems projects      business integration      business intelligence      business intelligence models      business knowledge and experience      business participation      business process      business process mapping      business requirements focused      business requirements specification      business simulation laboratory      business systems      business systems laboratory      business understanding      by the book      care      case studies      case study      CEO      CEO -- project leader communication      CEO as custodian      CEO definite views      certificates      challenges      challenging presentations      change facilitation      change for strategic reasons      chart of accounts      classification schemes      clever software      client changing scope      client compact      clinical codes      coaching      Cobol      COBOL CAN be retained      Cobol still viable      code schemes      coding conventions and standards      cognitive span      collapse      communication      competitive advantage      competitive advantage through precision configuration      competitiveness      compiler      complexity      compliance      compliance checklist      comprehensive testing      Compuware      conference speaking      conferences      confidentiality      configuration      consultant NOT delivering what required      contract      contract certificates      contract law      contracting      contractors      corporate planning      cost      cost-quality-time      CPT 4      CPT4      critical factors      critical factors for IT investment success      critical factors for success      critical factors for technology success      critical human foundation      critical issues      critical issues analysis      critical requirements      CRM Risk Control      cubic business model      custom development      custom software      customer focused      data      data content      data engineering      data entities      data warehouse      DB2      definitions      design against failure      design and development      design for success      determination of strategic essence      determining strategy      diagnostic code      diamonds in the dust      differentiated      differentiation      diffusion of innovations      discovery      dislike of failure      dispute resolution      do NOT change systems because of alleged software redundancy      do things competitors could NOT do      document pack      Dr James A Robertson      Dr James A Robertson PrEng      dramatic benefits      dramatically improved strategic management information      driver of success      Dunning-Kruger effect      ease of use      economic collapse      economics      effective communication      effectiveness      efficiencies      efficiency      efficient filing of emails      eliminate light bidders      email      engineer against failure      engineered data      engineering      engineering approach      engineering approach to strategy      engineering failure      engineering laboratory      engineering services      engineering solution design      engineering techniques      enhance differentiators      enhance the differentiators      enhancing the value of your present investment      ensuring project success      enterprise resource planning      ERP      ERP configuration      ERP failure      ERP procurement      ERP success      ERP taxonomies      ERP value      essence IS different      essence of business      essence of the business and how it thrives      ethics      examples      exceptionally bad code design      executive briefing      executive briefings      executive custody      executive decision support      executive engagement      executive forum      executive frustration      expose hidden agendas      facilitation      factors causing failure      factors causing IT investment failure      factors causing technology failure      factors to manage for success      failure      failure to address soft issues      fashion      file table of contents      Financial Information System      financial information systems      financial management      fixing your ERP      focus for projects      folder design      foundation for delivery      full training      functional entities      future      Gantt Chart      gap analysis      general ledger      George Paton      go-live      go-live certificate      governance      governance = care      governance failure      group consolidation      Group Consolidation Chart of Accounts      growth      gut feel factors      hand holding      harshest judge of governance      hate failure      head count reduction      health management software      hierarchies      high level requirements      high road      high value      high value implementations      high value solutions      high value systems implementation      highly effective chart of accounts      holistic view of solution      how do you achieve executive custody      how the organization differentiates itself      how to      how to do it      huge opportunity      human foundation      hype      Hyperion      IBIS      ICD 10      ICD10      importance of executive custody      improved management information      in-box rules      incremental enhancement of existing systems      ineffectiveness      inefficiency      information required from third party suppliers      information technology      information technology failure      Information Technology Strategy      information technology success      Informix      in-house courses      innovative software solutions      innovator      inside head of CEO      insightful      instructions      intangible      integrated business information system      integrated view of business      integrity      intelligent data      interactive training material      interview      invitation to bid      isolated CEO = explosion      IT      IT and strategy      IT Audit      IT failure      IT governance      IT lies      IT management      IT mythology      IT non-performance      IT people who lie      IT personnel socialization      IT procurement      IT projects that fail      IT strategy      IT systems      IT systems procurement      IT the harshest judge of governance      James Robertson      Jof Nelson      key performance indicators      Kirsten Speer      knowledge management      laboratory      lack of an engineering approach      lack of precision configuration      lack of strategic alignment      lawyer      leadership      legal agreement      legislation      lies      list of required software      listen carefully      litigation      logical entities      loss information      low road      loyalty      MacDonald      maintain code schemes      maintenance      maintenance management      Malcolm McDonald      management      management information      managing contractors      manual      marketing hype      master data      master data classifications      master test data      mature facilitation      mature facilitator      measurable      measures of alignment      mentoring      Microsoft Outlook      misrepresentation      missing link      mistique      morals      Munich      mystique      mythology      new future state      New South Africa      no drill down      non-disclosure      NOT classic project management      obsolete is a fashion statement      obsolete software      old software IS viable      once software works it always works      on-line seminars      opportunities      opportunity to turn the economy around      organizing Microsoft Outlook      orientation of IT staff      own business experience      passion to enable clients to thrive      people are part of the system      personality matrix      planning      platform for a tough contract      precisio      precision      precision configuration      precision configuration advisory      precision configuration leadership      precision data      precision taxonomies      Predictive Index      preparatory steps      prescribed table of contents      presentation technique      presentations      preventing failure      preventing falure      preventing project failure      pricing      principles      problem statement      procedure code      process      processor ignorant of language      procurement      procurement timeline      professional speaker      Professional Speakers Association of Southern Africa      profitability      programming languages are for the programmer      project facilitation      project leader      project leader -- CEO communication      project leadership      project management      project management IT project management      projects      prove it works      PSASA      psychology      psychometrics      public conferences      public presentations      public speaking      Pulse Measurement      quality      REAL issues in Business Information Systems      REAL value      recognizing failure      redaction      reduced audit costs      reduced head count      reference documents      Reg Barry      regulatory body      relationship Almighty      relationship orientated      remediation of existing systems      Rennies Group      reports      reports not reliable      request for proposal      requirements specification      results orientated      RFP      right things      rigorous process      rigorous strategic planning      risk management      Robert Priebatsch      robust business information systems procurement      robust business systems procurement      robust contracts      robust procurement      robust solutions      SAICE      SAP ABAP is similar to COBOL      scheduling procurement      scientific professional      score sheet      screen design      seminars      SEPT      service orientated      Service Orientated Architecture      simple techniques to enhance business information systems value      simulation      sloppy configuration      SOA      socialization      software      software assets      software design      software does NOT wear out      software is instructions for the bricklayer      software schedule      software specification      software specification standards      solution experience      solution knowledge      South Africa      South African Institution of Civil Engineering      speaking      Spirit Led      standards      strategic      strategic advisory      strategic alignment      strategic analysis      strategic analysis and design      strategic business improvement      strategic custom development      strategic definition      strategic discovery      strategic driver      strategic driving force      strategic engineered precision configuration      strategic engineered precision taxonomies      strategic essence      strategic financial information      strategic gap analysis      strategic governance      strategic information      strategic management      strategic management information      strategic plan      strategic planning      strategic project leader      strategic snapshots      strategic software      strategic solution architect advisory      strategic solution architect leadership      strategic solution architecture      strategically designed chart of accounts      strategy      strategy defined      strategy focused planning      Strategy Snapshot Toolset      StratGap      StratSnap      strengthen differentiators      structured analysis      structured chart of accounts      substantial management information      succeed by engineering against failure      success      successful deployment      survive      system knowledge and experience      table of contents      tailored presentations      take notes      taxonomies      taxonomy      taxonomy software      technology      technology failure      technology issues      technology management      tender document pack      tender pack      tender pack table of contents      test data      testing      The Critical Factors for Information Technology Investment Success      the Critical Factors for Success      the essence of the business      the essence of the business and how it thrives      the essence of the organization and how it thrives      the factors causing failure      the first hour      The REAL Issues in Business Information System success      things right      third party suppliers      third world countries      thrive      time      tipping point      tough certificates      tough contract management      tough contracts      tough procurement      tough terms      training      training material      treatment code      understanding of data      understanding the engineering approach      Uniface      unlocking value      use different languages for new components      V3 Consulting Engineers      validation data      value      versus process      video      webinar      webinars      weighted factors      what is executive custody      what is strategy      what is the essence of this organization and how does it thrive      what to do      where is IT going      why executive custody is required      why the organization exists and how it thrives      why your business information system is NOT delivering and HOW to FIX it      why your ERP is NOT delivering and how to fix it      workflow      writer     

Search Articles

Table of Contents

Home

About Dr James A Robertson PrEng -- The Business Systems Doctor -- and Other Topics

Catalogue of Major Business Information System Failures

About the Engineering Approach

James Robertson's Value Add

Attributes of a HIGH VALUE solution

Recognizing Business System Failure

The Critical Human Foundation

Old Software IS Viable

From South Africa

Competencies of Dr James A Robertson PrEng

About Professor Malcolm McDonald

Table of Contents

About my relationship with the Almighty Creator, Yah the Eternally Self-Existing

Comments relating to the Business Systems Industry and other topics

Testimonials and other positive material regarding James Robertson

Reference Articles

List of Articles

Article Catalogue

Achieving High Value Business Information System outcomes

Executive Custody -- What is it and HOW do you get it?

The REAL Issues in Integrated Business Information System Success

Part 1: Introduction

Part 2 -- Mythology and Lack of Executive Custody

Part 3 – Strategic Alignment and Precision Configuration

Why your ERP is NOT delivering and HOW to FIX it

IT Project Management

Pulse Measurement

CEO Anthony Lee Comments on his experience of the Pulse Measurement

No Charge Guarantee on the Pulse Measurement Service

Examples of Pulse Measurement Outcomes

Critical questions regarding the Pulse Measurement™

The Pulse Measurement Workflow

The Critical Factors for Business System (ERP+) Investment Success in the Pulse Measurement

Indicative Pulse Measurement Durations

What is a JAR&A Pulse Measurement?

Survival of the fittest – why it makes sense to measure the pulse of your business

Examples of Pulse Measurement Outcomes over 24 years

Sample Pulse Measurement Reports

Strategy

Strategic Essence: The Missing Link in Business Information Systems

Strategic Essence: Overview

Strategic Essence: Part 1 -- Strategy Defined

Strategic Essence: Part 2 -- Differentiation

Strategic Essence: Part 3 -- The Essence IS Different

Strategic Essence: Part 4 -- The Essence should be the Point of Departure

Strategic Essence: Part 5 -- Discovering Strategic Essence

Strategy -- the Essence of the Business: What is it and how do you develop actionable strategic plans?

Simple Steps to Increase the Strategic Value of your ERP Investment

Free Strategic Snapshot Toolset and Manual

A strategy focused planning system beyond traditional budgeting

Tough IT and ERP Procurement and Contracting that Works

Robust Business Systems Procurement

Part 1 -- Introduction

Part 2 -- Bill of Services, Laboratory, Go-live Certificate, etc

Part 3 -- Executive Engagement, Bid Compliance, Adjudication and other matters

Procurement Documents

Guidance and Advisory Services

The Art of Project Leadership

Why Regular Communication with the CEO is Vital

The Business Simulation Laboratory

Precision Configuration and Strategic Business Information Architecture

Precision Configuration based on Strategic Engineered Precision Taxonomies

The JAR&A Cubic Business Model

Highly Structured Strategic Chart of Accounts -- a Vital Element of your Corporate Information Arsenal

The Product Catalogue -- an Essential Element of any Precision Configuration

Attributes -- answers to the questions you have NOT yet thought to ask

Case Studies of Notably Successful Projects with high value Precision Configuration

092 Doing things differently and better -- ASCO Case Study 2-- BPM Summit 2013

088 Strategic ERP Invesment -- ASCO Case Study -- Service Management Conference and Exhibition Africa

026 Information Architecture and Design of FIS for Rennies Group -- Financial Information Systems Conf

018 CRM Risk Control: Designing and Implementing an Integrated Risk Mgmt Sys -- Integrated Risk Mgmt Conf

011 V3 Consulting Eng: Benefits of MIS to Professional Practice -- SAICE 15th Ann Conf on Computers in Civil Eng

Strategically Enriching your Business Information Systems

Part 1 -- Introduction

Part 2 -- Principles of Data Engineering

Part 3 -- Steps in applying these recommendations

Simple Steps to increase the strategic information value yield from your Business Systems Investment

The Full JAR&A Taxonomy Manual

Part 1: Introduction, Problem Statement, Definitions and Examples

Part 2: Why Use JAR&A, Required Knowledge and Experience, Cubic Business Model and Chart of Accounts and Taxonomy Software

Part 3: How to do it, Case Studies and White Papers and other References

Example General Ledger Manual

Business Process -- Irrelevant, Distracting and Dangerous

The RIGHT Approach

Custom Strategic Software Design and Oversight of Construction

Standards for Custom Software Specification

What IS Software?

IT Effectiveness

Organizing Outlook

Critical Factors for I.T. Success

A Moral and Ethical Dilemma -- Systems that Fail

Case Studies examining Business Information System failures

The BBC Digital Media Initiative Debacle

The Bridgestone -- IBM Conflict

Speaking and Training

Showcase of Conference Presentations

Most Viewed Presentations

Briefings and Seminars

Why your ERP/BIS is NOT delivering and HOW to FIX it

ERP and IT Procurement that Delivers Results

The Critical Factors for IT and ERP Investment Success

Other Seminars

Conferences and Public Presentations

Conferences 80 to 99 -- 2009 to Present

Conferences 60 to 79 -- 2005 to 2009

Conferences 40 to 59 -- 1996 to 2005

Conferences 20 to 39 -- 1994 to 1996

Conferences 01 to 19 -- 1989 to 1994

On-Line Seminars (Webinars)

Webinar on Preparing and Presenting Webinars

Contacting James A Robertson and Associates Limited